NOVO
Drawing of a house with its roof, windows, heating, walls, door and basement marked

Guide for bank advisors

Advisor guide: which customer needs what?

Buying a home, replacing a heating system, follow-up financing: for every customer situation this guide shows how to recognize it, what your customer needs now and which next step fits.

It starts with one question

What do you plan to do with your property next?

That is all it takes to open the subject. The answer almost always leads to one of the situations in this guide, and each has a clear next step.

You do not have to give energy advice for this. Your job is to recognize the situation, offer the step that fits and talk about financing at the right time. The technical advice comes from NOVO's energy consultants, who are independent of manufacturers and craftsmen.

Your customer's situation

Choose what applies to your customer. Each page shows the recommended path, the subsidies and your part.

Which invitation in the partner cockpit fits

In the cockpit you invite to one of three products. The invitation is non-binding and free for your customer. The two most often confused are the renovation report and the initial consultation: the report is for buyers, the consultation for owners.

The building blocks: what NOVO does for your customers

Every recommended path is made of these services. Your customer orders paid services expressly and personally.

  • Free initial consultation

    One of NOVO's energy consultants clarifies by phone or video what your customer plans and explains the process. A non-binding offer follows.

    Cost
    free
    Duration
    appointment booked online
    Result
    A clear next step and a non-binding offer
    Book an appointment
  • Energy check

    The free online check, called “Schnellcheck” in the partner cockpit: your customer describes the house and sees at once its efficiency class, the condition of its components, the savings potential and possible grants. The details from a property listing are enough.

    Cost
    free
    Duration
    a few minutes
    Result
    A first assessment of the house
    Go to the energy check
  • Renovation simulator

    Your tool in the advisory conversation: you enter the building, see its current state and compare scenarios from the legal minimum to an efficiency house, with costs, subsidies, savings and the development of the property's value.

    Cost
    for partner banks
    Duration
    during the conversation
    Result
    Scenarios as a PDF and renovation costs for the financing
    Simulator for companies
  • Renovation report

    For the purchase decision: the energy condition of the house and two scenarios, the duties after the change of owner and a comprehensive renovation, each with measures, costs and possible subsidies. Without a site visit, based on the listing, plans and details provided.

    Cost
    from €249
    Duration
    a few days
    Result
    A cost frame for purchase and financing
    Request an offer
  • Energy certificate

    Required for a sale and a letting. The online questionnaire checks whether a consumption certificate is allowed; if not, NOVO issues a requirement certificate.

    Cost
    consumption certificate €59, requirement certificate from €249
    Duration
    consumption certificate usually 48 hours (on working days) once the details are clarified; the requirement certificate needs plans and takes longer
    Result
    A registered energy certificate, valid for ten years
    Go to the energy certificate
  • Individual renovation roadmap (iSFP)

    The subsidized energy consulting for owners: a survey of the house, an agreed renovation concept and a roadmap that shows measures, their order, costs and subsidies. Every measure stays voluntary.

    Cost
    from €995 own share after the grant
    Duration
    a few weeks from the order
    Result
    Roadmap, investment need over the years, access to the iSFP bonus
    Go to the renovation roadmap
  • Funding support

    NOVO checks craftsmen's offers for eligibility, issues the technical confirmations for BAFA and KfW, accompanies the application and files the proofs after the work is done.

    Cost
    from €250 own share, subsidized by the federal government
    Duration
    from the check of the offers to the proof
    Result
    Application, approval and payout of the subsidy
    Request an offer
  • Heat load, hydraulic balancing, ventilation concept

    The calculations that heating installers, subsidy bodies and standards require: room-by-room heat load, hydraulic balancing and a ventilation concept.

    Cost
    by offer
    Duration
    by offer
    Result
    A calculation for the offer, the sizing and the subsidy
    Request an offer

Situation and service at a glance

The number shows the order of the steps in the recommended path.

Which service is recommended in which customer situation, with the order of the steps
SituationConsultationEnergy checkSimulatorReportCertificateiSFPFunding supportCalculations
Buying an existing homeEnergy check1Report2iSFP3
Home bought or inheritedConsultation1iSFP2Funding support3
Selling or lettingReport2Certificate1
Heating replacementConsultation1Funding support3Calculations2
Single measure: windows, roof or facadeConsultation1iSFP2Funding support3
Full renovation to an efficiency houseConsultation2Energy check1iSFP3Funding support4
Photovoltaics and storageConsultation2Energy check1iSFP3
Renovating, but where to start?Consultation2Energy check1iSFP3
Follow-up financingConsultation3Energy check2Simulator1iSFP4
Renovate later, plan todayConsultation2Energy check1iSFP3
Tax deduction instead of a grantConsultation1Funding support2
Landlords and owners' associationsConsultation2Certificate1iSFP3Funding support4
Commercial and non-residential buildingsConsultation1Certificate2

How the handover to NOVO works

You stay in the picture: NOVO informs you by e-mail and in the cockpit when your customer has booked an appointment or received an offer, and when the result is ready.

  1. You

    Invitation

    You invite in the cockpit, with your customer's e-mail address. The invitation comes from NOVO in your name.

  2. Your customer

    Schnellcheck and appointment

    Your customer answers the questions about the house and then books the free initial consultation themselves, by phone or video.

  3. NOVO

    Consultation and offer

    The energy consultant clarifies the house and the plan and sends a non-binding offer. It is accepted in writing.

  4. NOVO

    Consulting and result

    Documents, survey of the building, concept: at the end there is a roadmap, a report or a certificate, which you can see in the cockpit. For a roadmap, your customer then still signs a declaration for the grant.

  5. You

    Financing

    With the result you know the investment need. This is the right moment for the financing conversation.

Objections you will hear

After the changes to the law and the subsidies, many owners are unsettled. These answers help.

  • Your customer saysThe subsidies have been cut, haven't they?

    Your answerThere still are subsidies: grants for insulation and windows, for replacing the heating and for the energy consulting. The rates and conditions have changed. Which ones apply to your plan is what the free initial consultation clarifies.

  • Your customer saysRenovating is not worth it for me.

    Your answerWhether it is worth it only shows in the figures for your house: energy costs, CO₂ price and the property's value on one side, the investment and the subsidies on the other. You get these figures before you decide anything.

  • Your customer saysI would rather wait.

    Your answerPlanning does not mean building right away. But some parts of the subsidies fall on fixed dates, every six months for a heating replacement. If you plan, you know your options and decide yourself when to use them.

  • Your customer saysThen I can simply keep running my gas heating.

    Your answerYou may. The question is what running it will cost: the CO₂ price, grid fees and, for new gas and oil heating, a mandatory share of climate-friendly fuels from 2029. An independent assessment shows what makes economic sense for your house.

  • Your customer saysI already have a craftsman who will do it.

    Your answerGood, then the work itself is settled. For grants on the building envelope the application also needs an energy efficiency expert, and it must be filed before you place a binding order. That is exactly what the funding support takes care of.

  • Your customer saysWith a renovation roadmap you always get the higher grant, don't you?

    Your answerSince 21 July 2026 a new rule applies: for a single-family house, the bonus of 5 percentage points is granted only when the eligible investment reaches €30,000, and only on the part above it. An existing roadmap remains valid, and the energy consultant works out for you what applies to your project today.

  • Your customer saysAm I tied to your bank if I accept the invitation?

    Your answerNo. The energy consultation is independent of the financing, and you decide freely where you finance. Because I invited you, I see the status: the booked appointment, the offer and the result.

Subsidies at a glance

The most important programmes and rules for existing residential buildings in Germany. Since summer 2026 a new law and new subsidy guidelines apply; older overviews are out of date.

Building envelope and energy consulting

Heating replacement

Loans and tax

  • Renovation to an efficiency houseup to €150,000

    KfW loan per residential unit, with a repayment grant of up to 15% depending on the level reached. The levels 70 EE and 85 EE receive the loan without a repayment grant. Application through the financing bank, before the work starts.

    Source: KfW: residential buildings, loan (261), in German
  • Home ownership for families, purchase of an existing home€140,000 to €180,000

    KfW loan for families with a child and a household income of up to €90,000 (plus €10,000 for each further child) who buy a house of efficiency class F, G or H to live in. Condition: renovation to the efficiency house level 85 EE, or four defined single measures, within 54 months. The guideline runs until 31 December 2027.

    Source: KfW: home ownership for families, purchase of an existing home (308), in German
  • Supplementary loan for single measuresup to €120,000

    KfW loan per residential unit, only in addition to a grant commitment from BAFA or KfW that is at most 12 months old. Interest advantage for owner-occupiers with a household income of up to €90,000.

    Source: KfW: supplementary loan for single measures, residential buildings (358, 359), in German
  • Tax reduction under Section 35c of the Income Tax Act20%

    20% of the expenses, spread over 3 years, at most €40,000 per property. Only for an owner-occupied home that is more than 10 years old, and not for a measure that already receives a grant or a subsidized loan.

    Source: Section 35c of the Income Tax Act, in German

Duties and energy certificate

  • Duties after a change of owner2 years to comply

    The top-floor ceiling must be insulated if it does not meet the minimum thermal protection (Section 35 of the Building Modernization Act), as must accessible heating and hot-water pipes in unheated rooms (Section 69). In houses with at most two flats that the previous owner lived in on 1 February 2002, both duties only apply once the owner changes. The former duty to replace an old boiler after a purchase has not existed since 29 July 2026.

    Source: Building Modernization Act (GModG), text of the law, in German
  • New gas and oil heatingMandatory share from 2029

    Anyone who installs a gas, oil or liquid-gas heating system after 29 July 2026 must generate at least 10% of the heat from climate-friendly fuels from 2029, 15% from 2030, 30% from 2035 and 60% from 2040. The 65 percent rule no longer exists.

    Source: Federal information portal on the Building Modernization Act, in German
  • Municipal heat planningby 30 June 2028

    Large cities had to present their heat plan by 30 June 2026; all other municipalities have until 30 June 2028. The plan shows where heat networks are foreseen. It no longer triggers a duty for individual owners.

    Source: Section 4 of the Heat Planning Act, in German
  • Energy certificatevalid for 10 years

    Required for a sale, a letting, a lease and a leasing contract, and to be shown at the viewing at the latest. Breaches can be fined up to €10,000.

    Source: Building Modernization Act (GModG), text of the law, in German
  • Consumption or requirement certificateNew rule from 1 January 2027

    Until 31 December 2026, residential buildings with fewer than five flats and a building application before 1 November 1977 need a requirement certificate unless they reach the level of the Thermal Insulation Ordinance of 1977. Under the amended Section 80 of the Building Modernization Act this restriction no longer applies to residential buildings from 1 January 2027; the consumption certificate then rests on the consumption of 2 instead of 3 years.

    Source: Building Modernization Act (GModG), text of the law, in German

CO₂ costs

Photovoltaics

Which document the bank gets, and for what

The energy consulting produces documents that you need for the application and the loan file.

  • Energy certificate

    Proof of the efficiency class, for example for the KfW loan for families who buy an existing home (class F, G or H) and for valuing the collateral. Available for download in the cockpit.

  • Renovation report

    The cost frame for the purchase: mandatory measures and a comprehensive renovation, with the investment, possible subsidies and the investment after subsidies. The basis for the financing need.

  • Renovation roadmap (iSFP)

    Measures, their order and costs over the years. From it you read the financing need today and in the coming years.

  • Preliminary confirmation of the efficiency

    If your bank requires proof of the efficiency class or the energy demand the house reaches after the planned measures, NOVO issues a preliminary confirmation on request, usually together with the renovation report. An energy certificate always shows today's state. Say in your request whether your bank means the final energy demand or the primary energy demand.

  • Confirmation for the application (BzA)

    The technical confirmation by the energy efficiency expert that the KfW application requires: for the efficiency house loan through your bank and for the heating subsidy through the KfW portal.

  • Grant notice

    BAFA's commitment for a single measure. It is the precondition for KfW's supplementary loan and requires checked craftsmen's offers.

  • Proofs after completion

    The technical project proof for BAFA or the confirmation after completion for KfW. Only then is the grant paid out.

Frequent questions from advisors

Do I have to be able to answer energy questions as an advisor?

No. You recognize the situation and offer the next step that fits. The technical advice comes from NOVO's energy consultants.

What does the invitation cost my customer?

Nothing. The invitation, the energy check and the initial consultation are free and non-binding. Your customer accepts the offer after the consultation in writing; an energy certificate is only ordered bindingly on the payment page at the end of the questionnaire.

What happens after my invitation?

Your customer receives an e-mail from NOVO in your name, fills in the Schnellcheck and then books an appointment for the initial consultation themselves. NOVO reminds them by e-mail but does not book an appointment for them. If you see no appointment in the cockpit after a few days, a short call from you helps.

Why should I invite through the cockpit instead of simply recommending NOVO?

Only with the invitation is your customer assigned to you: you see the status and receive the notifications and the result. If your customer goes straight to the website, this link is missing.

What do I have to watch out for when inviting?

Your customer's correct e-mail address and phone number. A typo is the most frequent reason why an invitation does not arrive or NOVO cannot reach your customer. Invite with your customer's address, not with your own.

My customer cannot find the invitation any more. What can I do?

Write the customer's name to the NOVO team through the cockpit or by e-mail. The team sends the link again.

Can I invite a customer to two products?

One invitation is for one e-mail address and one product. If your customer needs, say, an energy certificate and a consultation, start with the more urgent one; NOVO clarifies the second in the conversation.

Who has to sign for the renovation roadmap?

One owner; where there are several, one signature is usually enough. An iSFP exists only for owners; after a purchase the notarized purchase contract is enough, and the entry in the land register does not have to exist yet.

If my customer replies to the invitation e-mail, does the reply reach me?

No. Replies and attachments go to the NOVO team, which handles them.

My customer has no internet access or struggles with online forms.

Then NOVO takes the details by phone; give the NOVO team a short note for that. Or you fill in the questionnaire together with your customer, with their documents on the table. Do not fill it in alone: for an energy certificate, what counts are the quantities from the bills and the details about a wood-burning stove and hot water. Without them the certificate is delayed or turns out wrong.

I would like to try the process myself. Is that possible?

Yes. Tell the NOVO team beforehand, otherwise your test request is handled like a real customer request.

What is the fastest way to reach the NOVO team?

In the cockpit through “Help & contact”: by e-mail, with a booked appointment or with a callback request. The callback request carries no message. If it is about a particular customer, write an e-mail with their name and your question; then the team can also answer in writing.

May NOVO recommend particular suppliers or tariffs to my customers?

No. Energy consultants are bound to neutrality. They recommend measures and standards, not manufacturers, craftsmen or tariffs.

Glossary

GModG
The Building Modernization Act (Gebäudemodernisierungsgesetz). It replaced the Buildings Energy Act (GEG) on 29 July 2026 and sets the requirements for buildings, heating systems and energy certificates in Germany.
BEG
Federal Funding for Efficient Buildings: the federal subsidy for single measures (grants through BAFA and KfW) and for the renovation to an efficiency house (KfW loan).
iSFP
Individual renovation roadmap: the uniform format of the subsidized energy consulting for residential buildings. It shows measures, their order, costs and subsidies and obliges the owner to nothing.
Energy efficiency expert
A specialist entered in the federal list of experts. For grants on the building envelope and for efficiency house loans, involving one is mandatory.
Efficiency house
A KfW standard (Effizienzhaus). The number states how much primary energy the house needs compared with a reference building: an efficiency house 85 needs 85 percent.
Efficiency class
The rating in the energy certificate from A+ (very good) to H (very poor), by final energy demand or consumption per square meter and year.
Worst Performing Building
A building that is among the worst of the stock in energy terms, as a rule efficiency class H. Such buildings receive subsidy bonuses.
Consumption certificate
An energy certificate (Verbrauchsausweis) based on the measured energy consumption of several consecutive years, shown by the heating bills. Cheaper, but dependent on how the occupants behave.
Requirement certificate
An energy certificate (Bedarfsausweis) based on a calculation of the building envelope and the building services, independent of how the occupants behave.
BzA and BnD
Confirmation for the application and confirmation after completion: the two technical confirmations KfW requires before the application and after the work.
TPB and TPN
Technical project description and technical project proof: the corresponding documents for BAFA grants.
Heat load
The output a heating system must deliver on the coldest day. Calculating it room by room is the basis for the right size of a heat pump.
Hydraulic balancing
Setting the heating system so that every radiator receives exactly the heat it needs. Mandatory for subsidized heating systems.

What happens next

  • Your bank works with NOVO

    Invite your customer in the partner cockpit and follow every step there.

    Go to the partner cockpit
  • Your bank is not a partner yet

    The simulator, the cockpit and the energy consulting can become part of your advice. We show you how.

    NOVO for companies
  • You own a home yourself

    With the free energy check you see in a few minutes where your house stands.

    Start the energy check
Need help?
We're happy to help!Book a phone call with usPrefer email? Contact us here.

We use cookies and similar technologies to analyze the use of our website and to fix errors.

If you consent (“Accept all”): In addition to the necessary measurements, AWS CloudWatch RUM sets cookies and records your session to diagnose errors. All entries and texts are already masked in your browser.

If you decline (“Necessary only”): With AWS CloudWatch RUM, we only record load times, errors and the pages you visit, without cookies and without session recording. For this, RUM stores a technical identifier in your browser.

You can find more details in our privacy policy and in the legal notice. You can withdraw your consent at any time via “Privacy settings” at the bottom of every page.