NOVO

Advisor guide

Your customer is planning work on windows, roof or facade

A single measure on the building envelope receives a grant if the application is filed before the binding order. Whether a renovation roadmap makes sense first depends on the size of the investment and on the plans for the coming years.

How to recognize the situation

  • Your customer has a craftsman's offer for windows, roof, facade or front door and asks for a loan for the amount of the offer.
  • Damage is the trigger: a leaking roof, drafty windows, a damp outer wall.
  • The scaffolding is up anyway because the roof or the facade is being repaired.
  • Your customer says the craftsman can start in a few weeks.
  • Your customer's calculation includes no grant, or they have heard of the tax reduction and do not know what applies to them.

What your customer needs now

Your customer needs the subsidy application before the binding order, and for it an energy efficiency expert who checks the offer and prepares the technical description for BAFA.

The open question is whether the measure stands alone. For a small measure, funding support is enough. If the investment is above €30,000 or further steps follow, the renovation roadmap pays off first.

What customers ask in this situation

  • Is there a grant for new windows?
  • I already have an offer. Can I sign?
  • Do I really need an energy consultant for this?
  • Is a renovation roadmap worth it if I only do the roof?
  • Grant or tax: which is better for me?

The recommended path with NOVO

How long the path is depends on the project. For a small measure, the middle step drops out.

  1. Step 1

    Free initial consultation

    The energy consultant clarifies whether the measure stands alone or is part of a larger project. The offer then contains the renovation roadmap or only the funding support.

    Cost
    free
    Duration
    appointment booked online
    Result
    A clear next step and a non-binding offer
    Book an appointment
  2. Step 2

    Individual renovation roadmap (iSFP)

    The roadmap pays off from an eligible investment of €30,000 or when further measures follow: it shows the sensible order and opens the iSFP bonus. For a small single measure it is not needed.

    Cost
    from €995 own share after the grant
    Duration
    a few weeks from the order
    Result
    Roadmap, investment need over the years, access to the iSFP bonus
    Go to the renovation roadmap
  3. Step 3

    Funding support

    An energy efficiency expert is mandatory for the grant. NOVO checks up to three craftsmen's offers, files the application with BAFA under a power of attorney and files the proofs after the work is done.

    Cost
    from €250 own share, subsidized by the federal government
    Duration
    from the check of the offers to the proof
    Result
    Application, approval and payout of the subsidy
    Request an offer

Subsidies and deadlines

For insulation, windows and exterior doors, BAFA pays a grant of 15%. The conditions are an energy efficiency expert and an application before the project starts. At the time of the application, the contract with the craftsman must exist, concluded with the subsidy commitment as its condition precedent or condition subsequent. After the commitment, 36 months remain to carry out the work.

Since 21 July 2026, the iSFP bonus of 5 percentage points applies only when the eligible investment reaches the ceiling that applies without a roadmap, €30,000 for one residential unit, and only to the part above it. A window replacement below this threshold does not receive a higher subsidy because of the renovation roadmap. For a roof or a facade above the threshold, the roadmap works twice: the ceiling of eligible costs for the first residential unit rises to €60,000, and only then is the part above €30,000 subsidized at all.

Owner-occupiers have an alternative: the tax reduction under Section 35c of the Income Tax Act, 20% of the expenses, spread over 3 years. For the same measure there is either the grant or the tax reduction, never both. More under tax deduction instead of a grant.

Your part in the advice

  1. Ask about the signature

    First clarify whether an order has already been placed or a down payment made. If not, the grant is possible.

  2. Invite

    Choose the invitation “Free iSFP initial consultation & Schnellcheck” in the partner cockpit. The initial consultation settles whether funding support is enough or a renovation roadmap comes first.

  3. Have the offer prepared

    An eligible offer states the technical values of the components (U-values, thermal conductivity groups), the address of the building, the name and address of the applicant, the planned period and the subsidy condition. Give your customer this list for the conversation with the craftsman.

  4. Finance the full amount, use the commitment

    The grant comes after the work is done. Finance the invoice amount and plan the grant as a repayment. With the grant notice you can apply for KfW's supplementary loan.

Invitation in the partner cockpitFree iSFP initial consultation & Schnellcheck

The way in for everyone who owns a house and wants to do something about it: your customer fills in the Schnellcheck and then books the free initial consultation themselves.

Conversation opener and objections

Conversation opener

Have you already signed the offer, or can we clarify the grant first?

  • Your customer saysThe craftsman can start next month, I do not want to wait.

    Your answerYou do not have to give up the date for that. Have a subsidy condition written into the contract and file the application before you place a binding order or make a down payment. Otherwise the grant is no longer possible for this measure.

  • Your customer saysI do not need an energy consultant for a few windows.

    Your answerFor the grant one is mandatory, and a grant covers 50% of the fee. The consultant also checks whether the windows in the offer reach the values the subsidy requires. If you live in the house yourself, the tax reduction is an alternative.

  • Your customer saysA renovation roadmap for a single measure is too much for me.

    Your answerFor a small measure you do not need one; funding support is enough then. It brings a higher grant only from an investment of €30,000. It also makes sense if you plan more in the coming years.

  • Your customer saysThe version the grant requires costs more than the grant brings.

    Your answerThat can happen, because the subsidy sets its own technical requirements for the components. Ask for offers for both versions and have the energy consultant compare them: extra cost, grant and savings over the years. Then you decide with figures.

The financing occasion

The occasion is the modernization loan for the invoice amount. The grant only comes after the work is done and the proofs are in.

With BAFA's grant notice, KfW's supplementary loan is available: up to €120,000 per residential unit, also for costs above the ceiling of the grant, with an interest advantage for owner-occupiers with a household income of up to €90,000. The notice may be at most 12 months old.

One measure is often followed by the next. If the renovation roadmap shows further steps, you know the amounts of the coming years: a basis for a larger financing or for a building-savings contract.

Pitfalls

  • An order or a down payment before the application counts as the start of the project. Planning and consulting may take place before it.
  • Offers without U-values or thermal conductivity groups cannot be checked. The craftsman has to revise the offer, and the application is delayed.
  • For the threshold of the iSFP bonus, the single application counts: costs from several applications in one year are not added up. The roadmap must exist at the time of the application.
  • The ceiling of €30,000 for the first residential unit applies per building and calendar year to all measures on the envelope together, not per measure.
  • The period for the work named in the contract is not a processing time of BAFA. Only the grant notice gives certainty.
  • Funding support is available only for work done by specialist firms, not for work the owner does themselves.
  • The bank and the subsidy can wait for each other: for the supplementary loan you need the grant notice, but your customer only wants to sign the contract with the craftsman once the financing is settled. The subsidy application requires this contract with a subsidy condition. So clarify the financing in principle as soon as the offers are in.
  • If one application covers several measures, NOVO files the proof only when all of them are finished and paid. Until then your customer pre-finances everything.
  • For very small measures the own share of the funding support can eat up the grant. For owner-occupiers the tax reduction is then often the simpler route. The initial consultation clarifies what pays off.
  • If a larger part of the windows is replaced, NOVO additionally prepares a ventilation concept for the application and charges for it separately. Say so beforehand.

Frequently asked questions

Is the renovation roadmap worth it for a single measure?

Through the bonus, only if the eligible investment exceeds €30,000. Below that it pays off when further measures follow: it shows the order, and the bonus can be used for 15 years. From the first quarter of 2027 there is a further bonus for insulation measures on the buildings that are among the worst in energy terms, and it requires a subsidized roadmap.

My customer has already signed the order. What now?

Without a subsidy condition in the contract, the grant is as a rule no longer possible for this measure. If your customer lives in the house, the tax reduction under Section 35c of the Income Tax Act may be an option; whether the requirements are met is for the tax adviser to clarify.

Who files the application with BAFA?

NOVO, with a power of attorney from your customer. Before that NOVO checks up to three offers and prepares the technical project description, and after the work is done the technical project proof.

When may my customer start the work?

After the application at the earliest, but then at their own risk. BAFA's grant notice gives certainty.

Can the grant and the tax reduction be combined?

Not for the same measure. For different measures on the same house it is possible, for example the grant for the heating and the tax reduction for the insulation.

How high are the eligible costs for several flats?

Per building and calendar year, €30,000 for the first residential unit, €15,000 each for the second to the sixth and €8,000 each from the seventh.

The work is finished. What does NOVO need for the payout?

Photos of the work, all invoices, the proof of payment for every invoice, including NOVO's, and the declaration of the specialist firm. The invoices are made out to the applicant and name the address of the building. Payment is by bank transfer; NOVO cannot file invoices paid in cash.

What happens if the invoice turns out higher than the offer?

The approved amount is a ceiling. The payout follows the paid invoices, up to this amount at most; that is why the energy consultant applies with a buffer on the costs. Whatever exceeds it, your customer pays without a grant.

The costs exceed the ceiling. What can be done?

The ceiling applies per building and calendar year. If the project consists of several measures, for example roof and windows, they can be spread over two calendar years; each then needs its own application. A single measure cannot be split across two applications. For a separate measure, owner-occupiers can also consider the tax reduction.

What happens next

  • Your bank works with NOVO

    Invite your customer in the partner cockpit and follow every step there.

    Go to the partner cockpit
  • Your bank is not a partner yet

    The simulator, the cockpit and the energy consulting can become part of your advice. We show you how.

    NOVO for companies
  • You own a home yourself

    With the free energy check you see in a few minutes where your house stands.

    Start the energy check
Need help?
We're happy to help!Book a phone call with usPrefer email? Contact us here.

We use cookies and similar technologies to analyze the use of our website and to fix errors.

If you consent (“Accept all”): In addition to the necessary measurements, AWS CloudWatch RUM sets cookies and records your session to diagnose errors. All entries and texts are already masked in your browser.

If you decline (“Necessary only”): With AWS CloudWatch RUM, we only record load times, errors and the pages you visit, without cookies and without session recording. For this, RUM stores a technical identifier in your browser.

You can find more details in our privacy policy and in the legal notice. You can withdraw your consent at any time via “Privacy settings” at the bottom of every page.